Vetted before they touch a roof
Kilo contractors are commercial electrical and roofing teams we assess ourselves: accreditation, insurance, references, and a first install supervised by a Kilo engineer.
Installation
Every Kilo system is engineered before it is ordered, built by Kilo contractors and tested string by string against the standards that govern commercial electrical work. Nothing is switched on until it passes.
Built to
Kilo contractors
Kilo contractors are commercial electrical and roofing teams we assess ourselves: accreditation, insurance, references, and a first install supervised by a Kilo engineer.
One panel, one inverter family, one battery range, one method statement. Crews fit the same system every time, so the hundredth install is as tight as the first.
Each gate has a checklist in the Kilo app with photos and test results. A Kilo engineer signs it before the job moves on. No signature, no next step.
Seven gates
Week one
We measure the site before we draw anything. The survey decides the design, so it is the longest visit we make before the build.
Signed off byKilo engineer
Week two
Two independent sign-offs before anything is ordered: one for the roof, one for the electrics.
Signed off byChartered structural engineer and Kilo design
Before we mobilise
The paperwork other installers leave to the customer. We handle every application and give you the dates.
Signed off byKilo
Week before install
Every person on your roof knows the plan, the risks and your opening hours before day one.
Signed off byKilo contractor, Kilo engineer
Install
Hidden work is photographed before it is covered, so nothing we sign off is taken on trust.
Signed off byKilo contractor
Before switch-on
Nothing is energised until it passes. Every string is tested and every result is written down.
Signed off byKilo engineer
Switch-on and first 30 days
We prove the system under load, then watch it against your business case before we call the job closed.
Signed off byKilo
The standards
| Standard | What it covers | Where Kilo applies it |
|---|---|---|
| BS 7671:2018+A4:2026IET and BSI | The wiring regulations for every electrical installation in the UK. Amendment 4 adds rules for battery systems. | Design, install and certification of every circuit. |
| ENA G99 Issue 2Energy Networks Association | Generation and storage connecting to the grid above 16 A per phase. Needs network approval first. | Every Kilo business system. We apply and manage it. |
| ENA G100Energy Networks Association | Export and import limitation schemes, locked after commissioning. | Wherever the network caps what the site can export. |
| IET Code of Practice for Electrical Energy Storage Systems, 3rd editionIET | Location, fire safety and protection for batteries in commercial buildings. | Every battery: where it goes, how it is protected, how it is stopped. |
| RC62 (2023)Fire Protection Association, with MCS and Solar Energy UK | Insurers’ fire safety recommendations for solar on commercial buildings. | Array layout, fire walls, access routes and yearly inspection. |
| BS EN 62446-1BSI | Commissioning tests, inspection and documentation for grid-connected solar. | Every string tested and recorded before switch-on. |
| IEC TS 62446-3IEC | Thermal imaging of solar arrays to find faults heat reveals. | At handover, and at every yearly inspection. |
| BS EN 1991-1-4 and BRE Digest 489BSI and BRE | Wind loads on buildings, and on panels mounted on roofs. | The structural calculation behind every roof we build on. |
| CDM 2015, Work at Height 2005, Control of Asbestos 2012HSE | Construction safety law: planning, roofs, and asbestos before work starts. | Phase plans, access design and asbestos surveys on older roofs. |
Handover
After handover, Kilo OS watches every string every day, and the system is inspected once a year with thermal imaging, as RC62 recommends for commercial buildings.
Questions
Kilo contractors: commercial electrical and roofing teams Kilo has assessed and trained on our kit and method. A named Kilo engineer runs your job, signs off every gate and is your single contact. Kilo holds the contract, the price and the warranty.
We do not guess. A chartered structural engineer checks the roof for the added weight and wind uplift before anything is ordered. If the roof needs work, or is not suitable, you hear it at the design stage, before you have spent anything on the build.
Many older commercial roofs do. We check your asbestos register at the survey and, where the work could disturb the roof fabric, arrange a refurbishment survey by a competent surveyor before any work starts, as the Control of Asbestos Regulations 2012 require.
We design the array to RC62, the fire safety recommendations insurers use for solar on commercial buildings, and send your insurer the design before the build so cover is confirmed first.
Usually not. Rooftop solar on most commercial buildings in England is permitted development, with no size cap since December 2023. Larger systems need prior approval from the council, and listed buildings need full consent. We check and apply for you.
MCS covers solar up to 50 kWp and batteries up to 50 kW, so it applies to our smaller systems. Most business systems are larger, and are designed and certified to BS 7671, G99, the IET Code of Practice and RC62, which is what the network operator and your insurer require.
Most of the work happens on the roof. Deliveries, lifts and the short shutdown to connect the system are planned around your opening hours, agreed with you in advance.
A 20 minute walk through your own half-hourly data and what the battery would earn.